Layout Procedure Of The Building Footings Following is the step-by-step procedure for the layout of RCC footings. 1. Cleaning: The PCC should be cleaned by removing all the wooden logs, fallen soil, debris, etc. Washing with water is a must if there is a layer of mud splash over the …
Read More »What is the Concrete Discharge Time Requirements
What is Concrete Discharge Time Requirements Concrete discharge time requirements ensure that hardened concrete would meet the requirements set at the design stage. It is the time available for placement of concrete in formworks after it has been mixed. When water is added to the dry mixture, chemical …