Clicky

land Surveyor Responsibilities 

land Surveyor Responsibilities 

The Land Surveyor is the person who is supposed to make precise measurements that will identify the boundary. Surveyors help in providing unique contours on the surface of the earth which will let the Engineers make maps and construction projects.

The following are the Duties of a Land Surveyor.

  1. The Surveyors have to measure the distance and the angles between specific points on the earth’s surface.
  2. Based on reference points, certain important feature points are located by traveling.
  3. Detailed research is carried out on the records related to the land, survey, and the titles of the land.
  4. The boundary lines are to be located by searching for the past boundary present in the site.
  5. The surveying is conducted and the obtained results are recorded. Later they are verified for accuracy and corrections.
  6. Based on the surveyed records plots, maps, the respective reports of the surveyed site is prepared.
  7. The findings obtained from the surveying is presented to the clients and the respective government agencies.
  8. The official land needs and water boundaries are established. These are established either for lease or deeds.

Land surveyors use special equipment to conduct measurements & evaluations of the sites for Public, Government & Private Property. The Responsibilities of land Surveyors include developing land Survey reports & performing calculations of measurements & evaluations.

Work Characteristics of Land Surveyor

The works performed by the surveyor can be divided into three different parts. They are:

  1. Field Work

  2. Office Work

  3. Instruments Care and Adjustments

Field Work Conducted by Surveyors

As mentioned in the duties of the surveyor, he has to determine the points and their respective distances and angles which have to be recorded in the form of field notes.

Learn More

  1. -Concrete Test: Slump test, compression test, split tensile test, soundness etc.

  2. -Soil Test: Core cutter test, compaction test, sand replacement test, triaxial test, consolidation test etc.

The operations involved in the field works are:

  • The initial establishment of benchmarks and all the stations as the reference. Based on these operations the horizontal and the vertical control is established.
  • The angles between the survey lines created have to be measured.
  • All the details of the survey are explained and located based on the stations and the lines between the stations. The details are the streams, buildings, milestones, streets, and any other natural or man-made features present in the area surveyed.
  • For the construction works related to buildings, culverts, sewers, bridges, and water supply schemes the lines have to set out and the grades are established by the surveyors.
  • Height or the elevation of certain points are determined by surveying by the surveyor. Or in either case, specific points have to be established in the required elevations.
  • Carrying out topographic surveying. This is the surveying of contour of the given land which involves both vertical and horizontal controls.
  • Parallel lines and perpendicular lines have to be established.
  • The inaccessible points have to be measured.
  • To conduct surveys past the obstacles. Many miscellaneous field works based on the trigonometric and geometric principles have to be conducted.
  • Determination of the meridian, latitude, and longitude or to determine the local time by carrying out observations on the sun or a star.

When dealing with field works, it is very important to understand the importance and the features of Field Notes.

Field notes are written notes that are prepared when the fieldwork is carried out. There are situations when the whole precision of the survey and the fieldwork becomes futile if the value recorded is wrong.

Hence the quality and competency of a surveyor’s work are more reflected in the field record when compared to the basic elements of surveying he performed.

Other Post.

  1. How to calculate the number of bricks in 1 CFT wall

  2. Types of Stone Masonry

  3. What Is Difference Between Pre-tension And Post-tension

The prepared field notes must be eligible, comprehensive, and Concise. The values and remarks have to be written in clean, clear plain letters and figures. There are certain basic rules to be kept while maintaining a field note. They are:

  • As soon as the observations are made, the values are recorded in the field book
  • The pencil used must be sharp 2H or 3H. Never make use of a soft or ink pencil
  • It is recommended to have a simple style of writing that must be consistent
  • Try to use a liberal number of sketches
  • Each day of survey work must end up with a brief note. This must have the title of the work, the date of the survey, the conditions of weather, the personnel involved, the list of the instruments, and the equipment used.
  • It is recommended not to erase. If a mistake is made, rule through the mistake, and the corrected value is marked above it.
  • The daily notes created must be signed.

The filed note consists of three parts:

1. Numerical Values

All the recorded measurements like length, angles, staff readings, offsets are recorded in this column on the field book. All the figures that are significant must be recorded correctly. Values nearest to 0.01 must be recorded. A value observed as 342.30 must be written as same and not as 343.3.

2. Sketches

The sketches will resemble the outlines, the topographic features, and the locations relative to each other. These are not made to the scale. If we plan to place the measurements on the sketches, correct belongings must be made while marking it. Always make a sketch which makes the interpretation easier. This must avoid maximum confusion. The sketches must be large, open as well as clear.

3. Explanatory Notes

All those that cannot be conveyed through the values and the remarks must be written in the explanatory note section. These remarks will help to proceed with the later works.

Learn More 

  1. Calculation Method For Find Out The Overlapping Length Of Beam, Column And Slab

  2. Bar Bending Schedule For Slab And Estimation Of Steel Reinforcement In Slab

Office Works Done By surveyor

Drafting, computing, and designing are the office works that have to be performed by the surveyor.

The drafting performed consists of the preparation of plans and the sections. These must be plotted to the measurement and to scale and prepare the topographic maps.

The computing process is done in two cases. Initially, it can be done for the plotting. Secondly, it can be constructed for the determination of the areas and the volumes.

Instruments Care and Adjustments by Surveyors

If there is a good experience in handling the equipment, the works can be carried out with great experience and precision. This knowledge of handling will make us understand the limitations of the instrument and can take proper care of this equipment.

There are many instruments like the level, theodolite, etc. that require great care with delicate handling. There are many delicate parts in the instruments, if any of the parts get affected, it will bring a total complaint and total loss.

The relative positions of the instruments must be checked while taking out the instrument and during its placement back after the use. Straining the parts of the instrument will result in incorrect measurements.

The Precautions that must be taken are:

  • The instrument must not be lifted by holding the telescope or the circular plate. We must hold the footplate or the leveling base.
  • The movement of the instrument from one place to another must be carried out by placing it on the shoulder. All the clamps are set tightly.
  • When not in use, the lens must be covered.
  • Setting up the instrument on a smooth floor without any kind of precautions must be avoided.
  • The instrument must not be exposed to dust and dampness or direct sun rays. A waterproof cover can be used to cover and protect it.
  • Not leave the instrument without any guard.
  • The steel tape after use must be cleaned and kept dry. While measuring, vehicles are not allowed to move over it.
  • In the case of a compass instrument, the compass must not be allowed to swing without any need. This is lifted off the pivot when not in use.

Land Surveyor Responsibilities & Duties

  • Conduct records management activities and perform historical and legal land ownership research.
  • Develop & inspect land surveying project contracts.
  • Support field measurement & layout.
  • Conduct standard calculations to identify areas, elevation & volumes of field Survey notes.
  • Conduct basic calculations using field note data.
  • Read, utilize and interpret design drawings & topographic maps.
  • Study, learn and interpret CAD computer applications.
  • Perform as Senior Project Leader for Survey at in-house and Mapping Projects.
  • Support Real Estate Product Line coordinator and in-house design group.
  • Provide consistent and superior quality documents for survey, design and building projects for all clients in region.
  • Perform as cadastral issue matter expert as team member.
  • Perform as Contracting Officer Technical Representative (COTR) for the Architect-Engineer.
  • Involve in implementing mapping contracts and Indefinite Quality (IQ) Surveying.
  • Provide vertical and horizontal control maps and government cost estimate for mapping & Survey Projects.

Other Post 

  1. How To Estimate Per Meter Weight Of Reinforcing Steel Bar

  2. What is crank Length of reinforcement

  3. How do you take off a Staircase


To Get More Information, Visit Our Official website
Land Surveying & Architects

JOIN US & LIKE OUR OFFICIAL FACEBOOK PAGE

THANKS.

About Raja Junaid Iqbal

Hi My name is Raja Junaid Iqbal and i am Land Surveyor by Profession but I've specialized in the field of Q,S and land development. As Professional Surveyor I engaged my self in all over the Gulf since 14 years.

Check Also

Hight of Instruments

How to Calculate the RL by HI method in surveying

How to Calculate the RL by HI Method in Surveying. In this article i will …

Leave a Reply

Your email address will not be published. Required fields are marked *

error: Content is protected !!