METHODS OF ESTIMATION OR TAKING OUT QUANTITIES

METHODS OF ESTIMATION OR TAKING OUT QUANTITIES

PROCESS OF TAKING OUT QUANTITIES:-

The quantities like earthwork, foundation concrete, brickwork in the plinth and superstructure, etc., can be a workout by any of the following methods.

a) Longwall – short wall method
b) Centerline method
c) Partly center line and short wall method

a) Long wall-short wall method:-


In this method, the wall along the length of the room is considered to be a long wall while the wall perpendicular to the longwall is said to be a short wall. To get the length of the longwall or short wall, calculate first the centerline lengths of individual walls. Then the length of the longwall, (out to out) may be calculated after adding half breadth at each end to its centerline length. Thus the length of the short wall measured into in and may be found by deducting half breadth from its centerline length at each end. The length of the longwall usually decreases from earthwork to brickwork in superstructure while the short wall increases. These lengths are multiplied by breadth and depth to get quantities.

b) Centerline method:-
Centre to Centre Line Method of Estimation

This method is suitable for walls of similar cross-sections. Here the total centerline length is multiplied by breadth and depth of respective item to get the total quantity at a time. When cross walls or partitions or veranda walls join with the main all, the centerline length gets reduced by half of the breadth for each junction. such junction or joints are studied carefully while calculating total centerline length. The estimates prepared by this method are the most accurate and quick.

Learn More 

  1. Calculation Method For Find Out The Overlapping Length Of Beam, Column And Slab

  2. Bar Bending Schedule For Slab And Estimation Of Steel Reinforcement In Slab

  3. How To Calculate The weight of Steel With Formula

c) Partly center line and partly cross wall method:-

This method is adopted when the external (i.e., around the building) wall is of one thickness, and the internal walls having different thicknesses. In such cases, the centerline method is applied to external walls and a long wall-short wall method is used to internal walls. This method suits different thicknesses of walls and different levels of foundations. Because of this reason, all Engineering departments are practicing this method.

Some example with problems of Quantity Taking Out Process:-

I. Example 1: From the given figure below calculate the detailed and abstract estimate for the single-roomed building (Load-bearing type structure) by a) longwall & short wall method (b) Center Line Method.

 

To get more information, Visit Our Official website
Land Surveying & Architects

JOIN US & LIKE OUR OFFICIAL FACEBOOK PAGE

THANKS.

 

 

About Raja Junaid Iqbal

Hi My name is Raja Junaid Iqbal and i am Land Surveyor by Profession but I've specialized in the field of Q,S and land development. As Professional Surveyor I engaged my self in all over the Gulf since 14 years.

Check Also

How to calculate the Quantity of Earthwork in Road.

How to calculate the Quantity of Earthwork in the Road

How to calculate the Quantity of Earthwork in Road. In this Article u will learn …

error: Content is protected !!