Checklist For R.C.C Slab & Beams

RCC Slab and Beams

Checklist For R.C.C Slab & Beams 1 Beam bottom’s line, level & width should be checked. 2 Beam side’s line, level & plumb should be checked. 3 Beam to beam measurements shall be checked as per architectural drawings. 4 Individual level & diagonal of each slab bay shall be checked. …

Read More »

Estimate this Slab Included Drawing

Slab-Calculation11

Estimate this Slab (Drawing Included). Questions:- Estimate this Slab (Drawing Included).   Calculation:- Estimate for Slab Casting (1:2:4). = 1×28′-6″x20′-11″x0′-5″ = 247.98 Cft. = 7.021 Cum. Estimate for Formwork. Soffit = 1×28′-6″x20’11” = 596.10 Sft. Side = 1×2(28′-6″+20′-11″)x0′-5″ = 41.11 Sft. Total Formwork = 637.21 Sft. = 59.22 Sqm. Estimate …