Dimension of  slab

Lx = five m.= 5000-mm.

Ly = three m. = 3000-mm.

Thickness = 125-mm.

Main bar-One = 10mm@ 150 c/c

Main bar-Two or say distribution bar) = 10-mm @ 150 c/c

Top extra bar-One = 8-mm @ 150 c/c

Top extra bar Two  8-mm @ 150 c/c

Clear cover of the slab = 25-mm.

Development length Ld = 45-d.

Learn More

  1. Calculation Method For Find Out The Overlapping Length Of Beam, Column And Slab
  2. Bar Bending Schedule For Slab And Estimation Of Steel Reinforcement In Slab

Calculation steps.

1  -The no. of the bars

a –  Main bars.

The no. of main bars – One

= [Lx ÷ bar spacing ] + One

= [ 5000 ÷ 150] + One

= 33.33 + One

= 43.33 nos.

By rounding off = 44 nos.

 b – Main bars – 2.

The no. of the main bars – Two ( or say distribution bar)

= [Ly ÷ bar spacing ] + One

= [ 3000 ÷ 150] + One

= 20 + One

21 nos. 

c – Top extra bars- One.

The no. of the top extra bars-One on one side

= [{(Ly ÷ Fore)÷ bar spacing} + One]

= [{ (3000 ÷ Fore) ÷ 150} +One]

= [{ 750 ÷ 150} +One]

= [{ 5} +One]

= Six nos.

The total no. of the top extra bars on both sides.

= [2 sides × Six nos.]

12 nos. 

Note: The top extra bars are provided at the Ly/fore span of the main bar on the both sides.

Learn More

  1. How To Calculate The Cutting Length Of Circular Stirrup

  2. Estimating Of Steel Bar Quantity for Construction

c – Top extra bars- Two .

The no. of the top extra bars- Two on one side

= [{(Lx ÷ 4)÷ bar spacing} +One]

= [{ (5000 ÷ 4) ÷ 150} +One]

= [{ 1250 ÷ 150} +One]

= [{ 8.33} +One]

9.33 nos.

By rounding off = Ten nos.

The total no. of the top extra bars on both sides

= [Two sides × 10nos.]

20 nos. 

Note: The top extra bars are provided at the Lx/fore span of the main bar on the both sides.

2 – Cutting length.

a – Main bar- One.

main bar

 

Cutting length of the main bar- One

  = [clear span +(Two nos. × development length) + (extra crank length) – (Two nos. × 45° bend)]

= [ 3000mm. + ( Two nos. × Ld) + ( 0.42D ) – ( Two nos. × One d)]

Here, D = [slab thickness – ( top and bottom clear cover) + bar diameter ]

= [125mm – (Two nos × 25 mm.) +Ten mm ]

=  [125mm – 60 mm]

D = 65 mm.

Cutting length of the main bar- One.

= [ 3000mm. + ( Two nos. × 45 × Ten mm. ) + ( 0.42× 65mm. ) – ( Two nos. × One × 10mm)]

= [ 3000mm. + 900mm. + 27.3mm. – 20mm. ]

= 3907.30 mm. = 3.91m.

Learn More

  1. Bar Bending Schedule for RCC Beam In Full Detail

  2. How to Calculate Staircase Concrete & Bar Bending Schedule And Staircase Reinforcement Details

b – Main bar- Two.

Cutting length of the main bar – Two

  = [clear span +(Two nos. × development length) + (extra crank length) – (Two nos. × 45° bend)]

= [ 5000mm. + ( Two nos. × Ld) + ( 0.42D ) – ( Two nos. × One d)]

= [ 5000mm. + ( Two nos. × 45 × 10mm. ) + ( 0.42× 65mm. ) – ( Two nos. × One × 10mm)]

= [ 5000mm. + 900mm. + 27.3mm. – 20mm. ]

= 5907.30 mm. = 5.91m.

c – Top extra bar – One.

Cutting length of the top extra bar- One

= [clear span Lx + (Two nos. × development length)]

= [5000mm. + ( Two nos. × 45d )]

=  [ 5000mm. + ( Two nos. × 45 × 8mm. )]

= [ 5000mm. + 720mm.]

= 5720 mm. = 5.72m.

d – Top extra bar- Two.

Cutting length of the top extra bar- Two

= [clear span Ly + (Two nos. × development length)]

= [3000mm. + ( Two nos. × 45d )]

=  [ 3000mm. + ( Two nos. × 45 × 8mm. )]

= [ 3000mm. + 720mm.]

= 3720 mm. = 3.72m.

Let us prepare the B.B.S table to calculate the weight of rebars.

Sl. No.

Type of Bar

Dia.

in mm.

Nos.

Length

in m.

Total length

in m.

Weight

Kg/m.

Total

 bar wt.

in kg.

1.

Main bar- One

10

44

3.91

172.04

0.617

  106.15

2.

Main bar- Two

10

21

5.91

124.11

0.617

  76.58

3.

Top extra bar- One

8

12

5.72

 68.64

0.395

  27.11

4.

Top extra bar-Two

8

20

3.72

74.40

0.395

  29.39

4.

       Total weight of the bars =

239.23

5.

          Add three % wastage =

     7.18

6.

The grand total wt. of the rebar’s =

246.41

 

Other Post 

  1. Brick Size and standard Brick dimensions 

  2. BBS For RCC Slab

  3. BBS For RCC Column


To Get More Information, Visit Our Official website


Land Surveying & Architects

JOIN US & LIKE OUR OFFICIAL FACEBOOK PAGE

THANKS.

About Raja Junaid Iqbal

Hi My name is Raja Junaid Iqbal and i am Land Surveyor by Profession but I've specialized in the field of Q,S and land development. As Professional Surveyor I engaged my self in all over the Gulf since 14 years.

Check Also

How to Calculate the Weight of Different Types of Steel

Calculate the weight of different types of steel

How to Calculate the Weight of Different Types of Steel. In this Articles i will …

Leave a Reply

Your email address will not be published. Required fields are marked *

error: Content is protected !!