How To Calculate The Cement Bags Required For 2000 sq. ft. House
Hello guys in this article we know about quantity of bags of cement is required for 2000 square feet house. Actual quantity of cement calculation is based on as per design but if design is not given then cement quantity calculation is based on Thumb Rule on experience basis and how many cement bags used in construction of 2000 square feet house.
How To Calculate The Cement bags required for 2000 sq. ft. house is based on different type of criteria
1) type of structure (Load Bearing/Framed)
2) Purpose of structure (Load depends on the utility)
3) Type of grade of concrete used
4) Size height of column and length of beam (in terms of height, as requirement varies according to construction i.e. whether horizontal or vertical. )
5) Most important is foundation type(depends on soil bearing conditions)
How many cement bags required for 2000 sq. ft. house
For general residential low rise building of ground floor house we have to calculate cement bags. We use different types of Thumb Rule for cement quantity calculation in all type of RCC structure footing, column, beam & RCC slab, brickwork, flooring & plastering.
Learn More
How To Calculate The Volume Of Concrete Triangular Pile Cap Having 3-Piles
Now taking various Thumb Rule for cement quantity calculation for 2000 square feet house
1) thumb rule for cement in RCC concrete is 0.301 cement bags/ sq. ft. built up area of low rise ground floor residential building
2) thumb rule for cement bags in surface ground flooring is 0.089 cement bags/ sq. ft. of built up area of low rise ground floor residential building.
3) thumb rule for cement bags in external wall brickwork is 1.26 cement bags/m3 of brickwork of 9 inch ( cement sand ratio 1:6)
4) thumb rule for cement bags in internal wall brick work is 1.28 cement bags/m3 of brickwork of 4.5 inch ( cement sand ratio 1:4)
5) thumb rule for cement bags for external plastering is 0.017017 cement bags/ sq. ft. plastering
6) thumb rule for cement bags for internal plastering is 0.0086 cement bags/ sq. ft. plastering
7) thumb rule for cement bags for ceiling plastering is 0.0051 cement bags/ sq. ft. plastering
How many cement bags required for 2000 square feet house ?
For the construction of residential building of ground floor we have RCC structure like footing, column, beam and slab. Taking one rough design of 2000 square feet house having different dimension of RCC structure like footing, column, beam and slab are following:
Learn More
How To Get Rid Of Common Errors In Concrete Floor Slab Construction
How many cement bags required for RCC structure of 2000 square feet house
● volume of RCC concrete calculation
1) footing size = 1500 mm × 1500mm × 300 mm
Length of footing = 1500 mm
Width of footing = 1500 mm
Height of footing = 300 mm
Depth of earth excavation = 1500 mm
Concrete size in footing = 1200mm×1200mm×300mm
No of footing = 20
Wet volume of concrete in all 20 no of footing = 1.2 m × 1.2 m × 0.3 m × 20 = 8.64 m3
2) column size = 300 mm × 400 mm
No of column = 20
Height above DPC = 3000 mm
Height above RCC slab = 900 mm
Depth of earth excavation = 1500 mm
Total height of column = 5400 mm
Wet volume of concrete for all 20 column
= 0.3 × 0.4× 5.4 × 20 = 12.96 m3
3) plinth beam size = 300mm × 300 mm
Width of beam = 300 mm
Depth of beam = 300 mm
Overall length of all beam = 400 ft. = 120000 mm
Wet volume of concrete = 0.3 × 0.3 × 120 = 10.8 m3
4) door beam size for external wall = 225mm × 150 mm
Overall length for external beam = 180 ft. = 54000 mm
Volume = 0.225 × 0.15 × 54 = 1.823 m3
Door beam size for internal wall = 125 mm × 150 mm
Overall length for internal beam = 220 ft = 66000 mm
Volume = 0.125 × 0.15 × 66 = 1.238 m3
Total volume of concrete = 1.823 + 1.238 = 3.061 m3
5) roof wall beam size for external wall = 225 mm × 200 mm
Overall length for external beam = 180 ft. = 54000 mm
Volume = 0.225 × 0.2 × 54 = 2.43 m3
Roof wall beam size for internal wall = 125 mm × 200 mm
Overall length for internal wall beam = 220 ft. = 66000 mm
Volume = 0.125 × 0.2 × 66 = 1.65 m3
Total volume = 2.43 + 1.65 = 4.08 m3
6) RCC roof slab = 50′ × 40’×6″
Length of slab = 50 feet
Width of slab = 40 feet
Thickness of slab = 6 inch = 0.5 feet
Volume = 50′ × 40’× 0.5′ = 1000 cubic feet
1 m3 = 35.3147 cu ft.
Volume = 1000/35.3147 = 28.32 m3
Now Total wet volume of concrete required for 2000 square feet house
Footing = 8.64 m3
Column = 12.96 m3
Plinth beam = 10.8 m3
Door beam = 3.06 m3
Roof beam = 4.08 m3
Roof slab = 28.32 m3
Total wet volume of concrete = 67.86 m3
Dry volume of concrete = 67.86 ×1.54 = 104.5 m3
If we take M20 grade of concrete in which cement sand and aggregate ratio is 1:1.5:3
Cement quantity = (1/5.5)× 104.5m3 × 1440 kg/m3
Cement weight = 27361 kg
1 cement bag weight = 50 kg
no of cement bags = 27361/50 = 547.2
Learn More
How to Create The Design Of RCC Structures With Details
547.2 no of cement bags required for RCC concrete structure footing, beam, column & slab for 2000 sq ft house of low rise building of ground floor.
Cement bags required for brickwork of 2000 square feet house
1) cement consumption in external brick wall
External brick wall length = 2(50+40) = 180 ft
Height of brick wall = 10 feet
Height of brick wall above roof slab = 3 feet
Depth of brick wall below plinth = 2 feet
Total height = 15 feet
Area of external brick wall = 180×15 = 2700 sq. ft.
Volume = 2700 sq. ft. × 9 inch = 2025 cu ft.
Volume = 2025/35.3147 = 57.43 m3
Volume of brickwork = 57.34 m3
Thumb rule for cement bags in external wall brickwork is 1.26 cement bags/m3 of brickwork of 9 inch ( cement sand ratio 1:6)
no of cement bags = 57.34 × 1.26 = 72.25 bags
2) Cement consumption in internal brick wall
brick wall length = 50+50+40+40 + 40= 220 ft.
Height of brick wall = 10 feet
Depth of brick wall below plinth = 2 feet
Total height = 12 feet
Area of external brick wall = 220×12 = 2640 sqft
Volume = 2640 sq. ft. × 4.5 inch = 990 cu ft.
Volume = 990/35.3147 = 28 m3
Volume of brickwork = 28 m3
Thumb rule for cement bags in internal wall brickwork is 1.28 cement bags/m3 of brickwork of 4.5 inch ( cement sand ratio 1:4)
no of cement bags = 28 × 1.28 = 36 bags
Total no of cement bags = 72.25 + 36 = 108.25
108.25 no of cement bags required for brickwork of 2000 square feet house
Learn More
Methods of Concrete Column Repair for Damages and Cracks
How many cement bags required for ground flooring of 2000 square feet house.
In ground flooring we use plain cement concrete m15 grade of concrete in which mix ratio of cement sand and aggregate is 1:2:4 and floor thickness is 6 inch ( 4 inch concrete + 2 inch paltering for flooring + tile flooring)
Ground flooring concrete slab = 50′ × 40’×6″
Length of slab = 50 feet
Width of slab = 40 feet
Thickness of slab = 6 inch = 0.5 feet
Volume = 50′ × 40’× 0.5′ = 1000 cubic feet
1 m3 = 35.3147 cu ft.
Volume = 1000/35.3147 = 28.317 m3
Wet volume = 28.317 m3
Dry volume = 28.317 × 1.54 = 43.60 m3
no of cement bags = (1/7) 43.60 × (1440/50)
no of cement bags = 179 bags
179 no of cement bags required for ground flooring of concrete, plastering of ground flooring and tile flooring of 2000 square feet house
How many cement bags required for plastering of 2000 square feet house
1) External plastering of brick wall
Length total = 180 ft.
Height = 10 ft.
Area of plastering = 180 × 10 = 1800 sq. ft.
thumb rule for cement bags for external plastering is 0.017017 cement bags/ sq. ft. plastering
no of cement bags = 1800 × 0.017017 = 30.6 bags
2) internal plastering of brick wall
Length total = 620 ft.
Height = 10 ft.
Area of plastering = 620 × 10 = 6200 sq. ft.
thumb rule for cement bags for external plastering is 0.0086 cement bags/ sq. ft. plastering
no of cement bags = 6200 × 0.0086 = 53.32 bags
3) ceiling plastering of roof slab
Length total = 2000 ft.
thumb rule for cement bags for ceiling plastering is 0.0051 cement bags/ ft. plastering
no of cement bags = 2000 × 0.0051 = 10.2 bags
Total no of cement bags = 30.6+ 53.32 + 10.2 = 94
94 no of cement bags required for external wall plastering, internal wall plastering and ceiling plastering of 2000 square feet house
Learn More
What is Concrete Discharge Time Requirements
Now total number of cement bags required for 2000 square feet house
1) R.C.C Concrete = 547.2 bags
2) Brickwork = 108.25 bags
3) Flooring + Septic tank + stair = 179 bags
4) Plastering = 94 bags
Total no of cement bags = 928.45 = 929
929 (+ 5% and _ 5℅ shift) no of cement bags ( 547.2 cement bags for RCC concrete, 108.25 cement bags for brickwork, 179 cement bags for flooring, septic tank including stair & 94 cement bags for plastering) are required for construction of 2000 square feet house of low rise ground floor building.
This is a general guidelines and actual quantity of steel may vary for special design.
4 comments
Pingback: How To Calculate The Length Of Roof Rafters - Surveying & Architects
Pingback: Long Wall And Short Wall Method - Surveying & Architects
Pingback: How To Calculate The Plastering Quantity Cement Sand Ratio - Surveying & Architects
Pingback: What will be the cost of 9" brick wall masonry - Surveying & Architects